Modikwa Platinum Mine EMPr Amendment

Short Project Title: Modikwa Platinum Mine EMPr Amendment
   
Project Title: Environmental Authorisation Process associated with the inclusion of the Doornbosch Mining Right and Consolidation of the MPM EMPr amendments
   
Project Synopsis: Modikwa Platinum Mine (MPM) is an operational mine situated approximately 20 km west of Burgersfort and 18 km north of Steelpoort within the Sekhukhune District Municipality in the Limpopo Province. MPM proposes to amend and consolidate their Environmental Management Programme (EMPr), which was approved in 2001, to include the activities associated with the Doornbosch Mining Right, granted in terms of Section 102 of the Minerals and Petroleum Resources Development Act 28 of 2002. The Doornbosch Mining Right associated with portion 2 of the farm Doornbosch 294 KT, will be mined as an extension of the existing MPM South 2 Shaft operations through the existing South 2 Shaft infrastructure. During the amendment of the MPM EMPr to include the activities associated with the mining of the Doornbosch reserve, the original EMPr and the amendments to the EMPr will be consolidated into a single document. The consolidation process will involve the collation of the original EMPr approved in 2001, and a number of EMPr amendments, which were developed and approved for additional activities not included in the original EMPr. The consolidated EMPr will ultimately provide an overview of activities and infrastructure included in each of the approved EMPrs, summary of the specialist recommendations, and the consolidated mitigation measures to assist with the implementation and monitoring of the management measures. It is proposed that the Doornbosch Mining Right associated with portion 2 of the farm Doornbosch 294 KT, will be mined as an extension of the existing MPM South 2 Shaft operations through the existing South 2 Shaft approved infrastructure. No additional surface infrastructure will be required as a result of the mining of the reserve associated with the Doornbosch Mining Right.
   
Official Reference: DMR Reference Number: 129MR
   
SRK Project Reference Number: 521501
   
Project Location: Sekhukhune District Municipality, Limpopo Province
   
Status of the project: Draft Environmental Impact Assessment and Management Programme
   
SRK Project Manager: Franciska Lake
   
Contact person: Helen Mushiane
   
Email: hmushiane@srk.co.za
   
Contact Number: Tel No: (011) 441 6152
Fax No: 086 506 3365

 

Documents

 Document  File Size  Date  Status  
         
521501_MPM EMPr Consolidation and Doornbosch MR Amendment_Draft  for Public Review Final_20180122 2,536 KB January 2018  Active

 

Appendices

 Document  File Size  Date  Status  
         
Appendix 1_EAP Qualifications        

Appendix 1_KILI

214 KB January 2018  Active

Appendix 1_LAKF

171 KB January 2018  Active

Appendix 1_MUSH

75 KB January 2018  Active

Appendix 1_RETE

152 KB January 2018  Active
Appendix 2_EAP's CVs        

Appendix 2_KilianDA_Oct_2016.docx_QR

243 KB January 2018 Active

Appendix 2_LakeF_Nov_2017.docx_QR

290 KB January 2018 Active

Appendix 2_MushianeH_Aug_2017.docx_QR

175 KB January 2018 Active

Appendix 2_RetiefE_Jun_2017.docx_QR

275 KB January 2018 Active
Appendix 3_Locality Map        

Appendix 3_Modikwa_LocalityMap_20170825

4,404 KB January 2018 Active
Appendix 4_Listed Activity Map        

Appendix 4_Listed Activity Map_20170825

4,408 KB January 2018 Active
Appendix 5_ Mining Right and Prospecting Right        

Appendix 5_Modikwa EMPR Prospecting Permit

70 KB January 2018 Active

Appendix 5_MR LP 129 (amended)

92 KB January 2018 Active
Appendix 6_Windeed        

Appendix 6_Driekop 253 KT

64 KB January 2018 Active

Appendix 6_Hendriksplaats 281 KT

91 KB January 2018 Active

Appendix 6_Maandagshoek 254 Portion 0

92 KB January 2018 Active

Appendix 6_Onverwacht 292 KT Portion 1

98 KB January 2018 Active

Appendix 6_Windeed Doornbosch 294 KT Ptn 2

53 KB January 2018 Active

Appendix 6_Winterveld 293 KT Portion 0

96 KB January 2018 Active
Appendix 7_Surface Infrastructure Map        

Appendix 7_Surface Infrastructure Map

0 KB January 2018 Active
Appendix 8_MPM pipeline Layout        

Appendix 8_Modikwa Pipeline Layout 1

3,890 KB January 2018 Active

Appendix 8_Modikwa Pipeline Layout 2

2,634 KB January 2018 Active

Appendix 8_Modikwa Pipeline Layout 3

3,294 KB January 2018 Active

Appendix 8_Modikwa Pipeline Layout 4

2,623 KB January 2018 Active

Appendix 8_Modikwa Pipeline Layout 5

3,061 KB January 2018 Active

Appendix 8_Modikwa Pipeline Layout 6

3,362 KB January 2018 Active
Appendix 9_Stakeholder Engagement        

Appendix_9-1_I&AP database

       

Appendix 9-5_IAP_Database_Including CRR_Final DEIA_20171211

342 KB January 2018 Active

Appendix_9-2_Attendance Register

       

Appendix 9-2_Kgoshi meeting_20170920

112 KB January 2018 Active

Appendix 9-2_Landowners meeting_20170908

100 KB January 2018 Active

Appendix_9-3_Public Participation Presentation

       

Appendix 9-3_Landowner presentation_20170907

1,453 KB January 2018 Active

Appendix 9-3_TA&Sec21Focus Group Meeting_Final_20170919

1,519 KB January 2018 Active

Appendix_9-4_Background Information Document

       

Appendix 9-4_BID_FINAL_Rev1_20170821

534 KB January 2018 Active

Appendix 9-4_BID_FINAL_Rev1_Sepedi_20170822

692 KB January 2018 Active

Appendix_9-5_Advertisements

       

Appendix 9-5_MPM Doornbosch MR Announcement Advert_Final_20170818_English

288 KB January 2018 Active

Appendix 9-5_MPM Doornbosch MR Announcement Advert_Final_20170818_Sepedi

289 KB January 2018 Active

Appendix 9-5_Polokwane observer tear sheet_20170825

500 KB January 2018 Active

Appendix_9-6 Site Notices (Announcement)

       

Appendix 9-6_Site Notice Placement_20170831_Final

702 KB January 2018 Active

Appendix 9-6_SN_English

27 KB January 2018 Active

Appendix 9-6_SN_Sepedi

31 KB January 2018 Active

Appendix_9-7 Stakeholder letters (DSR)

       

Appendix 9-7_MPM EMPr Availability of Draft Scoping _Final sepedi_ Rev 2_201700901

389 KB January 2018 Active

Appendix 9-7_MPM EMPr Availability of Draft Scoping_final_English_ Rev 2_20170901

310 KB January 2018 Active

Appendix_9-8 Site Notices (DSR)

       

Appendix 9-8_MPM Doornbosch MR Announcement  Availibility of DSR Site Notice_ Draft_ English_Final_Rev1_20170901

167 KB January 2018 Active

Appendix 9-8_MPM Doornbosch MR Announcement  Availibility of DSR Site Notice_ Draft_ Sepedi Final__Rev1_20170901

226 KB January 2018 Active

Appendix_9-9 Photos (DSR)

       

Appendix 9-9_Site Notice Placement_20170831_Final

765 KB January 2018 Active

Appendix_9-10 Emails (DSR)

       

Appendix 9-10_Availability of the DSR emails_2017102

860 KB January 2018 Active

Appendix 9-10_Submission of the DSR_20171002

71 KB January 2018 Active

Appendix 9-10_Submission of the DSR2_20171002

73 KB January 2018 Active

Appendix_9-11 Stakeholder letters (Draft EIA EMPr)

       

Appendix 9-11_MPM EMPr availability of Draft EIA EMPr letter_English_Final_20180118

427 KB January 2018 Active

Appendix 9-11_MPM EMPr availability of Draft EIA EMPr letter_Sepedi_Final_20180118

490 KB January 2018 Active

Appendix_9-12 Notices (Draft EIA EMPr)

       

Appendix 9_12_MPM Doornbosch MR Announcement  Availibility of Draft EIA EMPr Site Notice_Final_ 20180120

173 KB January 2018 Active

Appendix_9-13 DMR Communication

       

Appendix 9-13_Acceptance letter for scoping original_20173011

560 KB January 2018 Active

Appendix 9-13_Acknowledgement letter for scoping

260 KB January 2018 Active

Appendix 9-13_Acknowledgment letter_20171018

264 KB January 2018 Active

Appendix_9-14 CRR

       

Appendix_9-14_CRR_20180119

281 KB January 2018 Active
Appendix 10_ Master Map        

Appenidx 10_Modikwa_Mine_Master_Map_11122017

0 KB January 2018 Active
Appendix 11_Removal of trees permit        

Appendix 11_South 2 shaft Removal of protect trees permit

61 KB January 2018 Active
Appendix 12_ Summary of Heritage Sites        

Appendix 12_Summary of Heritage Sites

39 KB January 2018 Active
Appendix 13_Management Measures        

Annexure 13_Management_Measures

932 KB January 2018 Active
Appendix 14_Summary of Impacts        

Appendix 14_Summary of EMPs and EMPrs Impacts

725 KB January 2018 Active
Appendix 15_Summary of recommendations        

Appendix 15_MPM_Specialist_Recommendations_2010118

435 KB January 2018 Active
Appendix 16_Environmental Awareness Plan        

Appendix 16_MOD-ALL-ENV-PRO-0006- Environmental Competence, Training and Awareness (EMS 4.4.2)

524 KB January 2018 Active

Figures

 Document  File Size  Date  Status  
         

Figure 1-1 Overall Mine Layout

6,445 KB January 2018  Active

Figure 2-1_District and local municipalities

6,964 KB January 2018 Active

Figure 3-1_Regional locality map

7,993 KB January 2018 Active

Figure 7-1_Surface rights owners, mining rights and traditional authorities

6,612 KB January 2018 Active

Figure 8-1_Infrastructure Layout

7,815 KB January 2018 Active

Figure 8-2_ Ventilation shafts

6,470 KB January 2018 Active

Figure 8-4_Bulk storage of fuel and lubricants

4,376 KB January 2018 Active

Figure 12-1_Location of public places and site notices

4,600 KB January 2018 Active

Figure 13-1_Soils types

2,099 KB January 2018 Active

Figure 13-2__Floodlines

726 KB January 2018 Active

Figure 13-3_Biome, bioregion and vegetation types

1,565 KB January 2018 Active

Figure 13-4_Riparian areas

4,213 KB January 2018 Active

Figure 13-5_Heritage sites

6,821 KB January 2018 Active

Figure 13-6__Current land use map

6,462 KB January 2018 Active

Figure 20-1_SW and PW Monitoring_20180126

451 KB January 2018 Active

Figure 20-2_Biomonitoring_20180126

446 KB January 2018 Active

Figure 20-3_BH_Monitoring_20180126

442 KB January 2018 Active

Figure 20-4_Noise_20180126

418 KB January 2018 Active

Figure 20-5_Dust_Monitoring_20180126

697 KB January 2018 Active

 

Last modified: Friday, January 26, 2018 - 15:07
SRK Africa